B. M. Ross and Associates was retained to complete a site and facility needs assessment in order to develop a building and road layout to meet the security and traffic requirements of the site at the main site entrance. The final design included channelized entrance lanes, specialized security equipment, lighting design, staff and storage parking, facility pumping station and a back-up generator.
The building was designed to accommodate security features and specialty equipment required by the security forces using the building and back-up systems for key components.
BMROSS was the lead consulting firm throughout the project, working with Adolfo Spaleta, Architects Ltd. and Melex Engineering as sub-consultants. Total cost of the project was approximately $2.75 million. The project was completed in the fall of 2006.